We enhanced the road infrastructure in Jesup by overlaying 6 inches of concrete over nearly a mile of existing asphalt, significantly extending the road’s lifespan. Additionally, we constructed a 300-foot, 8-inch reinforced Portland Cement Concrete (PCC) street to support increased traffic loads and provide long-term durability.